Case Study: Automated Warehouse System, Jiangsu
To improve factory intelligence, digitalization, and material handling efficiency while meeting high-density storage requirements, STON Robotics deployed an automated warehouse system integrated within the factory facility.
The system combines computer control, networking, data communication, and automatic identification technologies to achieve automated storage and retrieval, digital warehouse management, intelligent material tracking, and visualized operational monitoring.
System Overview
● Storage Capacity: 1430 locations
● Stacking Height: 11 layers
● Load Capacity:
• Large stacker crane: ≥ 1000 kg
• Small stacker crane: ≥ 500 kg
● Positioning Accuracy:
• Horizontal travel: ±5 mm
• Vertical lifting: ±5 mm
• Fork positioning: ±3 mm
Fast Delivery
Traditional automated warehouse systems typically require 6–10 months for delivery.STON Robotics’ integrated drive-control cabinet-free system reduces delivery time to as fast as 2 months.
20% Higher Storage Density
Compared with conventional 9-layer stacker cranes, the STON system supports up to 11 stacking layers through servo-driven gear-and-rack technology without wire ropes, increasing storage capacity by 20%.
Cabinet-Free Control System
The cabinet-free control system integrates traditional electrical cabinet functions into compact drive-control chips, eliminating complex wiring, programming, and commissioning.