Cable Company, Jiangsu

Case Study: Cable Company, Jiangsu
The customer required efficient storage and management of cable coils, with a strong focus on improving material handling efficiency.
By implementing an aerial sorting smart warehouse, a digitalized, three-dimensional, and high-density storage solution was introduced for cable coil storage, enhancing both storage safety and inventory turnover efficiency.

System Overview
● SKU Count: 11
● Pallet Types: 11
● Coil Diameter: 0.5–1.2 m
● Average Load per Pallet: 1.5 t
● Stacking Height: 3–5 levels
● Average Cycle Time: 1.2 min
● Storage Capacity: 4,400 units

Fast Deployment in as Fast as 1 Month
Space logistics robots enable simple installation, rapid centralized commissioning, and quick start-up. With highly standardized software, no installation is required within the storage area, and system upgrades can be performed online.

Significant Efficiency Improvement
Powered by STON Robotics’ proprietary intelligent scheduling and sorting system, manual searching is eliminated, enabling fast and accurate handling of products with varying specifications.
● Inbound efficiency increased by 2×
● Outbound efficiency increased by 10×

Turning Idle Space into Value
With low facility requirements and flexible deployment, the system makes use of existing idle space—including outdoor areas—to create cost-effective storage solutions.
Through high-precision stacking, elimination of forklift aisles, and increased storage height, overall storage capacity is increased by 3×, transforming unused space into valuable storage assets.