Axle Production Line, Liuzhou
The automotive chassis system production line at the Liuzhou facility of a company based in Dandong, Liaoning was commissioned in May 2014.
● Cycle Time: 120 seconds per unit
● Daily Output: 400 sets
● Annual Capacity: 130,000 sets
● Loading/Unloading Time: 30 seconds
The system adopts a dual-head gantry robot with advanced functions including automatic recognition, error-proofing, and automatic rotation angle adjustment, enabling efficient and precise workpiece handling for loading and unloading operations.